PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing metal framing at the 3rd floor Facing North-East.jpg Installing storm piping at the 4th floor Facing East.jpg Installing Storm piping at the High Roof Facing West.jpg Interior metal Framing at the 3rd floor Waiting Area Facing North-West.jpg Laying out block at the 2nd floor UCIA Facing North-East.jpg Erecting the stone panels at the South Elevation 1.jpg Erecting the stone panels at the South Elevation 2.jpg Erecting the stone panels at the South Elevation 3.jpg Installing pipe hangers at the 4th floor Facing North.jpg
Previous pageNext page Laying out block at the 2nd floor UCIA Facing North-East
Laying out block at the 2nd floor UCIA Facing North-East